FRENCHMANS ROAD
This job consisted of strengthening the main bridge girder. Numerous length plates were installed to form a much thicker and stronger top flange.
This operation was carried out swiftly, with 4 hours for completion.
This project was in conjunction with our friends at McNealy Brown.