KILBURN HIGH ROAD RAIL BRIDGE
As part of this rail bridge refurbishment plates were installed on each end of the bridge down to the abutments. These were fixed using TCB bolts and welded in places. The team spent many weeks surveying, fabricating and installing on this job. The client was very happy and all works were passed off without snags.