WHITE HEART BRIDGE
This was a strengthening, ballast retention and inspection project. We removed all ballast plates, fabricated and installed new GRP boards with GRP inspection lids. There were a number of repairs carried out which included high grade steel fabricated and fixed to each end of the girders which added a lot more strength and protection to the bridge. Every trough angle was replaced along with two 3m flange repairs to the underside. Once again a very satisfied client.